The building gets built
to the drawing.

Survey, sanction, supervision, measurement and certification, carried by one appointed team from the first site visit to the occupation certificate. What is drawn is what gets built, and someone signs for it.

Area on the books
4.00 Crsq.ft under project management consultancy
Projects
018 ongoing, 7 completed
Years on site
0continuous practice since 1982
Empanelments
0LIC, TATA, RCF and MHADA

01 The appointment

What sits with us,
and what stays with you.

A project management appointment only works if the split is written down before anyone is on site. This is ours, in the order it comes up. Nothing in the middle column is subcontracted back to the people it checks.

Who carries which duty on a TEEARCH project management appointment
Duty TEEARCH Contractor Client
Site survey, plot measurement and the baseline record TEEARCH
Drawings, specifications and tender documents TEEARCH
Statutory approvals and clearances, driven to sanction TEEARCH
Rates, tender comparison and award recommendation TEEARCH recommends · Client awards
Labour, materials, plant and execution Contractor
Samples, shop drawings and method statements Contractor submits · TEEARCH approves
Quality checks, site instructions and non‑conformance TEEARCH
Measurement of work done and bill certification TEEARCH
Release of payment against a certified bill Client
Variations, scope changes and what they cost Client instructs · TEEARCH prices
Occupation certificate and handover TEEARCH

Holds it Shares it Not theirs

02 The programme

Five stages, and who
is on the line in each.

Every project runs on its own calendar, so the chart below is set out in stages rather than weeks. What it shows is the shape of the appointment: where a duty starts, where it ends, and the one line that never stops.

  • Survey & measurementAppointment → Baseline
  • Existing records & title documentsBaseline
  • Drawings & specificationBaseline → Sanction
  • Statutory clearancesBaseline → Sanction
  • Tender, rates & awardSanction → Construction
  • Site supervision & qualityConstruction
  • Measurement & bill certificationConstruction
  • Occupation certificate & handoverConstruction → Handover
  • Contractor & authority liaisonAppointment → Handover

03 The scope

Four phases, and the
failure each one stops.

The scope in the order it happens. Against each phase is the thing it exists to prevent — every one of them something that costs more the later it is found.

Fig. 01 Site works under project management consultancy
Tower cranes over a construction site

Survey & measurement

Physical site surveys and plot measurement establishing the true, verifiable baseline for everything that follows. Boundaries, levels, existing structures and encroachments are recorded before a line is drawn, because every dispute later is argued against this set.

What it prevents

An argument two years later about a measurement nobody took.

Approvals & compliance

Building Proposal, Aviation, Environmental, Fire, Tree, Forest and Defence clearances driven to sanction. Liaisoning is not a side service here: the approval path is what sets the programme, so it is mapped in the first month and worked in parallel with the drawings rather than after them.

What it prevents

A programme that stops at plinth because one clearance was left until it was needed.

Supervision & control

Site supervision, control and alignment with project specifications, checked against drawings, not assumptions. Work that does not match the specification is stopped and recorded as a non‑conformance while it is still cheap to correct.

What it prevents

Work that has to be opened up again because nobody checked it against the drawing.

Contractor liaison & certification

Coordination with contractors and authorities so the programme, the drawing and the site all agree. Work done is measured on site and certified before a bill is released, which is the point at which a project management appointment either pays for itself or does not.

What it prevents

A bill paid for work that was never measured.

04 The clearance board

Every consent a Mumbai
project has to carry.

Which of these a project needs depends on where it sits, how tall it goes and what is on the plot already. The board is worked out in the first month, so nothing arrives as a surprise at plinth.

C.01

Building Proposal

Planning authority · MCGM

C.02

Aviation NOC

Airports Authority of India

C.03

Environmental

State environment authority

C.04

Fire NOC

Chief Fire Officer

C.05

Tree cutting

Tree Authority

C.06

Forest NOC

Forest Department

C.07

Defence NOC

Defence Estates

C.08

CC & OC

Planning authority · MCGM

05 The book of work

Twenty‑five projects,
named and measured.

The whole book, not a shortlist. Societies, municipal colonies, institutions and one of the largest redevelopments in the city, with the area against each.

Ongoing project management consultancy projects, largest first
No. Project Location Area sq.ft Relative area
01B.D.D. ChawlWorliWorli2,25,81,482
02LIC Jeevan Shanti CHSLVile Parle (W)Vile Parle (W)70,86,468
03Deonar Municipal ColonyDeonarDeonar47,08,000
04Jai Punit Nagar CHSLBorivali (W)Borivali (W)6,40,306
05Lancelot CHSLBorivali (W)Borivali (W)6,27,437
06Dharam Palace CHSLBorivali (E)Borivali (E)6,24,811
07Mandpeshwar Dham CHSLBorivali (W)Borivali (W)5,59,744
08Manish NagarAndheri (W)Andheri (W)5,54,935
09Amrut Sagar CHSLBorivali (W)Borivali (W)4,22,344
10Crystal Paradise CHSLAndheri (W)Andheri (W)3,73,739
11Jai Matru Ashish CHSLBorivali (W)Borivali (W)3,70,812
12Shyam Gokul Garden CHSLKandivali (E)Kandivali (E)3,70,000
13Shree Durgadatta Thard CHSLMalad (E)Malad (E)3,45,600
14Court Chamber CHSLBorivali (W)Borivali (W)2,98,500
15Eksar Laxminarayan CHSLBorivali (W)Borivali (W)1,97,200
16Shree Shubh CHSLBorivali (W)Borivali (W)1,67,500
17Sai Gyandeep CHSLSantacruz (W)Santacruz (W)78,469
18Shree Sai Chhatra CHSLBorivali (W)Borivali (W)27,464
Total ongoing4,00,34,811

Bar length is relative to the largest project in the column, not between the two.

06 Empanelment

Vetted before you
ever asked.

Empanelment means the practice is pre‑approved to work on an institution's projects. For a client it shortens due diligence, and it is why societies, developers and institutions across Mumbai keep coming back.

LIC

Life Insurance Corporation

On the panel for LIC's building work, and currently running the Jeevan Shanti redevelopment at Vile Parle.

TATA

Tata group

Pre‑approved for group project work, with the procurement and reporting discipline that comes with it.

RCF

Rashtriya Chemicals & Fertilizers

Empanelled for public sector work, where the audit trail on measurement and certification is the deliverable.

MHADA

Grade 1 licence holder

The licence that lets the practice take on MHADA redevelopment, held by the Managing Director.

07 Appointment

Send the plot, the drawings
and whatever is already
on site.

Tell us where the project has reached — a society still voting, a sanctioned plan, or a job half built and drifting. You will hear back within one working day, from someone who stays on the file.

Send with the first email

  • Plot address, and the society or company name
  • Sanctioned plans or drawings, if any exist
  • The stage the project has reached
  • One person who can sign for decisions
Consultant
Teearch Architects and Consultants Pvt. Ltd.